240Z Project

24OZ: Prepared bodyparts for alcohol dipping

I’ve been working for my job like crazy lately and now i have a lot of overtime. So i decided to take one day off and spend some long overdue time in the garage πŸ™‚
I’ve saved some money lately for bringing parts for Chemical dipping (See details below).
However i had to spend two hours yesterday preparing everything. removing small bolts and bits like the chrome trim on the taillight panels:
DSC_0935 - Kopie

And removed:
DSC_0936 - Kopie

Then i collected all t he parts from My garage and my second workshop at home and somehow felt i need to make one of these cool “exploded view” pictures. Always wanted to so this was a great opportunity πŸ™‚
P1140757 - Kopie

P1140764 - Kopie

So i collected the parts from my two chassis and some more i bought. therefore a lot of different colours πŸ™‚ What we have is in total 23 pieces:
2x Doors
1x Roof
1x Front center valance
2x Front coner valances
2x Metal Headlight surroundings
1x Hood
1x Trunk
2x Taillight covers
1x Taillight center cover
2x Fenders
2x Access-flaps
2x Toolbox flaps
1x Hood cowl
1x Dashboard cowl
2x Mudflap metal pieces

And another pic:
P1140766 - Kopie

Finally loaded and today i brought them to the specal company:
P1140769 - Kopie

Compared to most of the companies they don’t use Acid for dipping but a own mixture of Solvents. Different kinds of alcohol (Rum, Tequila and Whiskey maybe? :P) and they’re quite famous. The advantage is that this solvend is 100% neutralized when cleaned with water at the end. so no corrosive leftovers are there at the end.
The friendly staff was quite nice and told me a bit of their process. they are like 4o people and a big part of their business they’re dipping complete cars and a lot of big parts. My car will get a Complete paint- and rust removal, a rust passivating as well as a cleaning and then a be primered with Doltan 2k Washprimer to prepare from new rust while waiting to be worked on / painted.
I managed to take a shot from outside where you see a dipped Chassis from a different customer. It’s not cleaned or primered yet. Should be able to pick up my parts within a month. This brings me a big step towareds the completed project, while this is still many years away…
P1140770 - Kopie

Leave a Reply

Your email address will not be published. Required fields are marked *